{"id":4336,"date":"2011-11-15T14:32:16","date_gmt":"2011-11-15T19:32:16","guid":{"rendered":"http:\/\/www.ise.ufl.edu\/oemp\/?page_id=4336"},"modified":"2025-04-16T09:15:37","modified_gmt":"2025-04-16T14:15:37","slug":"05proj","status":"publish","type":"page","link":"https:\/\/ise.ufl.edu\/oemp\/proj\/05proj\/","title":{"rendered":"Master&#8217;s Projects:  Class of 2005"},"content":{"rendered":"<table style=\"width: 511.6px\">\n<tbody>\n<tr>\n<td class=\"xl69\" style=\"width: 404px\"><strong>Project Title<\/strong><\/td>\n<td class=\"xl70\" style=\"width: 87.6px\"><strong>Mentor<\/strong><\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Assigning Sand Pits Using Mixed Integer Programming<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Geunes<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">CMMI for SE\/SW with Agile Processes<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Romeijn<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">COTS in a Traditional Non-COTS Environment &#8211; A Supply Chain Management Perspective<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Geunes<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">ERP Implementation And BPR<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Tufekci<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">FBI Encoding Automation Kaizen and Post-Event Analysis<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Schaub<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Feasibility of Using Bundled Inventory for Long Term Projects<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Akcali<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Global Positioning System (GPS) Percipitable Water in Forecasting Lightning at Spaceport Canaveral<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Romeijn<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Improved Reliability through Efficient Use of Data and Resources<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Romeijn<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Increasing Performance through the Implementation of Lean Strategies<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Tufekci<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Is CMMI and EVMS the Answer to Software Project Failure?<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Schaub<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Nanobit Improvement Project<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Schaub<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">New Manufacturing Equipment Acquisition and Implementation Process<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Tufekci<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Optimizing the Mix of Transmission Planning Projects for Electric Utilities<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Romeijn<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Probabilistic and Deterministic Analysis of Gas Turbine Vane Metal Thickness and TBC Coating Thickness<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Romeijn<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Process Improvement:\u00a0\u00a0Boeing Delta IV Maintenance Program<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Tufekci<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Procurement Management in the Defense Contracting Industry:\u00a0\u00a0Engineer-to-Order vs. Build-to-Print<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Geunes<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Re-Engineering Performance Management<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Schaub<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Statistical Process Control for the Capability Maturity Model Integration<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Romeijn<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Strike Price Optimization<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Geunes\/AitSahlia<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">Taking Process Management to the Next Level<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Schaub<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 404px\">United Space Alliance Nonconformance Information System<\/td>\n<td class=\"xl68\" style=\"width: 87.6px\">Akcali<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Project Title Mentor Assigning Sand Pits Using Mixed Integer Programming Geunes CMMI for SE\/SW with Agile Processes Romeijn COTS in a Traditional Non-COTS Environment &#8211; A Supply Chain Management Perspective Geunes ERP Implementation And BPR Tufekci FBI Encoding Automation Kaizen and Post-Event Analysis Schaub Feasibility of Using Bundled Inventory for Long Term Projects Akcali Global [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"parent":4266,"menu_order":6,"comment_status":"closed","ping_status":"closed","template":"page-templates\/page-sidebar-none.php","meta":{"_acf_changed":false,"inline_featured_image":false,"featured_post":"","footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-4336","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/4336","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/types\/page"}],"replies":[{"embeddable":true,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/comments?post=4336"}],"version-history":[{"count":1,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/4336\/revisions"}],"predecessor-version":[{"id":15021,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/4336\/revisions\/15021"}],"up":[{"embeddable":true,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/4266"}],"wp:attachment":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/media?parent=4336"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}