{"id":4318,"date":"2011-11-15T14:29:53","date_gmt":"2011-11-15T19:29:53","guid":{"rendered":"http:\/\/www.ise.ufl.edu\/oemp\/?page_id=4318"},"modified":"2025-04-16T09:15:37","modified_gmt":"2025-04-16T14:15:37","slug":"02proj","status":"publish","type":"page","link":"https:\/\/ise.ufl.edu\/oemp\/proj\/02proj\/","title":{"rendered":"Master&#8217;s Projects:  Class of 2002"},"content":{"rendered":"<table style=\"width: 445.2px\">\n<tbody>\n<tr>\n<td class=\"xl69\" style=\"width: 353px\"><strong>Project Title<\/strong><\/td>\n<td class=\"xl70\" style=\"width: 57.2px\"><strong>Mentor<\/strong><\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">A Critical Look at the Integrated Product Team Structure and the Modification Process: A Business Process Improvement Effort<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Tufekci<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">A Proposal to Improve the Process of Staff Allocation at Architecture\/Engineering Firms<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Geunes<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Advanced Customer Marketing Innovations: Product Locator System<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Elzinga<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Carnot: A Methodology for Mining Profits from Any Process<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Bai<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Chartered Semiconductors: Knowledge Management for Technology Transfer<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\"><\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Computer Software Development:\u00a0\u00a0Process Reengineering for PK Group in Vergys, Inc.-From the Waterfall Process to a<br \/>\nComponent-Based Development Process<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Bai<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Creating a Labor Scheduling Tool for Distribution Centers<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Geunes<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Energy Reduction Analysis<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Patterson<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Green Power: Applications and Analyses of Wind Power as an Alternative Energy Resource<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Elzinga<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Improving a Hazardous Materials Tracking System at a Small Commercial Aircraft Rework Facility<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Elzinga<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Improving the 500-Hour Periodic Inspection of the HH-60 Pavehawk<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Geunes<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Information Integration in the Analytical Laboratory for Effective Knowledge Transfer to Enable and Optimize Scientific Research and Development<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Shen<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">IT Improvements at H.W. Lochner, Inc.<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Elzinga<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Lean\/Flow Manufacturing at ClosetMaid<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Tufekci<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">PDM &amp; Paravant: The Struggle to Keep It All and Join the Big Leagues<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Tufekci<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Performance Simulation of a 2nd Tier Relay Network in a Cellular System<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Bai<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Process Improvement for New Service Connection<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Geunes<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Process Improvement: Software Verification and Validation<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Bai<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Product Feature-Based Scheduling and Costing: Developing Customizable Routings through Constraint Programming in Baan IV<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Geunes<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Productivity Improvement Plan for Tampa Land Development Engineering Unit<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Elzinga<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Redesign and Optimization of the Submarine Officer Training Pipeline<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Geunes<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Redesign\/Implementation of Web Based Knowledge Base\/Newsgroup<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Bai<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Reengineering of a Maintenance Program<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Tufekci<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Reengineering of a Semiconductor: Maintenance Organization<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Tufekci<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Reengineering the Lessons Learned Process Used by the Airframe Division of Argo-Tech Costa Mesa<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Tufekci<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">Supply Chain Management at Honeywell International<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Shen<\/td>\n<\/tr>\n<tr>\n<td class=\"xl66\" style=\"width: 353px\">The Integrated Installation and Configuration Management System<\/td>\n<td class=\"xl68\" style=\"width: 57.2px\">Geunes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Project Title Mentor A Critical Look at the Integrated Product Team Structure and the Modification Process: A Business Process Improvement Effort Tufekci A Proposal to Improve the Process of Staff Allocation at Architecture\/Engineering Firms Geunes Advanced Customer Marketing Innovations: Product Locator System Elzinga Carnot: A Methodology for Mining Profits from Any Process Bai Chartered Semiconductors: [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"parent":4266,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"page-templates\/page-sidebar-none.php","meta":{"_acf_changed":false,"inline_featured_image":false,"featured_post":"","footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-4318","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/4318","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/types\/page"}],"replies":[{"embeddable":true,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/comments?post=4318"}],"version-history":[{"count":1,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/4318\/revisions"}],"predecessor-version":[{"id":15015,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/4318\/revisions\/15015"}],"up":[{"embeddable":true,"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/pages\/4266"}],"wp:attachment":[{"href":"https:\/\/ise.ufl.edu\/oemp\/wp-json\/wp\/v2\/media?parent=4318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}