Project Title |
Mentor |
Applied Process Improvements in Furniture Inventory Management |
Geunes |
Business Plan for A Contactless Mobile Payment Application |
Stanfill |
CMMI Level X to Level Y: Degree of Quality Improvement |
Schaub |
Corrosion Rate Study for Life Cycle Assessment of Aerospace Hardware |
Schaub |
Design Standardization of Large Precision Space Structures – A Feasibility Study |
AitSahlia |
Dynamic Price Engine |
Richard |
Feasibility Analysis of Mass Transit Upgrades at KSC |
Schaub |
Helium Scheduler Measurement and Optimization |
Sapra |
Improving Small Caliber Production Efficiency |
AitSahlia |
Laser Line Convergence Vehicle Alignment System |
Sapra |
Lean Event Pearl Harbor |
Hartman |
Lockheed Martin Development Inspection Methods Plan For Receiving Inspection |
Hartman |
Marketing A System to Raise And Lower A Sailboat Mast |
Schaub |
Measuring the Costs of Custom Products Through Better Technology Utilization |
Middelkoop |
Modeling and Analysis of Global Economic Centers of Gravity |
Smith |
NASA Constellation Supply Chain Modeling And Optimization |
Sapra |
Shuttle Integrated Operations Optimization |
Smith |
Start-up for A Small Business |
Geunes |
Systems Engineering Cost Model |
Hartman |
Total Asset Utilization |
Schaub |