Project Title |
Mentor |
Assigning Sand Pits Using Mixed Integer Programming |
Geunes |
CMMI for SE/SW with Agile Processes |
Romeijn |
COTS in a Traditional Non-COTS Environment – A Supply Chain Management Perspective |
Geunes |
ERP Implementation And BPR |
Tufekci |
FBI Encoding Automation Kaizen and Post-Event Analysis |
Schaub |
Feasibility of Using Bundled Inventory for Long Term Projects |
Akcali |
Global Positioning System (GPS) Percipitable Water in Forecasting Lightning at Spaceport Canaveral |
Romeijn |
Improved Reliability through Efficient Use of Data and Resources |
Romeijn |
Increasing Performance through the Implementation of Lean Strategies |
Tufekci |
Is CMMI and EVMS the Answer to Software Project Failure? |
Schaub |
Nanobit Improvement Project |
Schaub |
New Manufacturing Equipment Acquisition and Implementation Process |
Tufekci |
Optimizing the Mix of Transmission Planning Projects for Electric Utilities |
Romeijn |
Probabilistic and Deterministic Analysis of Gas Turbine Vane Metal Thickness and TBC Coating Thickness |
Romeijn |
Process Improvement: Boeing Delta IV Maintenance Program |
Tufekci |
Procurement Management in the Defense Contracting Industry: Engineer-to-Order vs. Build-to-Print |
Geunes |
Re-Engineering Performance Management |
Schaub |
Statistical Process Control for the Capability Maturity Model Integration |
Romeijn |
Strike Price Optimization |
Geunes/AitSahlia |
Taking Process Management to the Next Level |
Schaub |
United Space Alliance Nonconformance Information System |
Akcali |