|
|
|
|
|
|
|
Student
|
|
Advisor
|
|
Project Title
|
|
|
|
|
|
| Michael Alcantara |
|
Elif Akcali |
|
Process Improvement: Physical Configuration Audit for Department of Defense Acquisition, Technology and Logistics |
| Christopher Baker |
|
Diane Schaub |
|
SRB Hardware Discrepancy Resolution and Certification Process Analysis |
| Jason Barber |
|
Diane Schaub |
|
Redesign of LSDE New Hire Orientation and Evaluation Process |
| Melissa Batis |
|
Alan Sawyer |
|
Data Architecture Vision for the Constellation Program |
| Kurt Batson |
|
Joe Geunes |
|
Process Improvement at the NASA Shuttle Logistics Depot |
| Michael Briesch |
|
Edwin Romeijn |
|
Analysis of the Uncertainty in the Measured Power Output and Efficiency of an Integrated Gasification Combined Cycle (IGCC) Power Plant |
| William Buckley |
|
Amar Sapra |
|
Design, Engineering, & Production Management of Residential Real Estate Developments |
| Rafael Bustamante |
|
Elif Akcali |
|
Assessing the Value of RL10 Rocket Engine Leak Checks During Launch Site Processing |
| Michael Collins |
|
Diane Schaub |
|
Redesign of LSDE New Hire Orientation and Evaluation Process |
| Michael DeLoye |
|
Mahendrarajah Nimalendran |
|
Regulation FD and Stock Market Reactions to Earnings Announcements |
| Michelle Dennis |
|
Elif Akcali |
|
Improving Manufacturing Productivity with "Ready to Work" Packages |
| Daniel Evans |
|
Diane Schaub |
|
Proof of Certification |
| Jay Evans |
|
Edwin Romeijn |
|
Statistical Analysis of Orbiter Tiles Damaged in Flight |
| Brandon Folz |
|
Joe Geunes |
|
MLI Production Process Improvements at Harris Corporation |
| Dennis Godwin |
|
Diane Schaub |
|
Proof of Certification |
| Leigh Harmon |
|
Cole Smith |
|
Optimizing Telecommunications within Harris Corporation |
| K.C. Henry |
|
Diane Schaub |
|
SRB Hardware Discrepancy Resolution and Certification Process Analysis |
| Julia Hess |
|
Joe Geunes |
|
Process Improvement at the NASA Shuttle Logistics Depot |
| Leandro James |
|
Edwin Romeijn |
|
Statistical Analysis of Orbiter Tiles Damaged in Flight |
| Jeremiah Johnson |
|
Edwin Romeijn |
|
Statistical Analysis of Orbiter Tiles Damaged in Flight |
| Gary Koser |
|
Cole Smith |
|
Determining the Thresholds for Inter-Campus Mass Transportation for Community Colleges |
| Ellen Kwok |
|
Diane Schaub |
|
Metrics in Software: How Metrics Impact the Software Development Lifecycle |
| Richard Lilley |
|
Joe Geunes |
|
Forecasting Asset Utilization and Inventory Optimization in the Harris Test Equipment Center |
| Eric Lin |
|
Diane Schaub |
|
Metrics in Software: How Metrics Impact the Software Development Lifecycle |
| Heather Mann |
|
Diane Schaub |
|
An Analysis of How One Company's Payload Processing Program Might Better Use Performance Measurement to Motivate Individual Behavior |
| Kungun Mathur |
|
Cole Smith |
|
Optimizing Telecommunications within Harris Corporation |
| Kevin McCall |
|
Elif Akcali |
|
Selective Soldering Equipment: Evaluation, Process Characterization, & Product Qualification |
| Robert McNeill |
|
Diane Schaub |
|
Applying EVMS Principles to Small Contracts (less than $20 million) |
| Sameh Mikhail |
|
Diane Schaub |
|
Applying EVMS Principles to Small Contracts (less than $20 million) |
| Joseph Nazareth |
|
Edwin Romeijn |
|
Analysis of Setup Control Unit (SCU) for Design Deficiencies in Preparation for a Redesign |
| Keith Richard |
|
Diane Schaub |
|
SRB Hardware Discrepancy Resolution and Certification Process Analysis |
| Robert Scott |
|
Amar Sapra |
|
Network Optimization in an Equipment Pooling Environment |
| Christopher Smith |
|
Diane Schaub |
|
SRB Hardware Discrepancy Resolution and Certification Process Analysis |
| Ryan Smith |
|
Joe Geunes |
|
Process Improvement at the NASA Shuttle Logistics Depot |
| Nicholas Tracy |
|
Diane Schaub |
|
Balanced Scorecard Applied to Performance Management Planning |
| Nicole Turner |
|
Joe Geunes |
|
Small Firm, Growing Pains: Engineering & Water Resources, Inc. Development of a Quality Management Program |
| Nathan Varn |
|
Joe Geunes |
|
MLI Production Process Improvements at Harris Corporation |
| Max Weiss |
|
Elif Akcali |
|
Improving Manufacturing Productivity with "Ready to Work" Packages |
| Nicholas Zicchino |
|
Edwin Romeijn |
|
SMT Automated Processes: Line Balance, Optimization, and Manpower Analysis Capacity, Capability, and Manpower Analysis |