|
|
|
|
|
Student
|
Advisor
|
Project Title
|
|
|
|
| Sam Ajlani |
Suleyman Tufekci |
Optimization of Technical and Industrial Courses in Georgia 's Technical College |
| Karen Beauchamp |
Joseph Geunes |
Developing A Preventative Maintenance Program For The CCAFS 1A Command Systems |
| Mike Carbone |
Max Shen |
A Business Case Simulation for Redevelopment of Commercial Buildings Into Storage Facilities |
| Dave Colburn |
Edwin Romeijn |
Use of decision tree analysis in combination with utility functions for establishing the optimum development of an optimum business strategy for new nuclear fuel material designs accounting for risk |
| Rick Davis |
Diane Schaub |
Reengineering the Delivery and Documentation of Regulatory Required Training |
| Guy Delp |
Elif Akcali |
Planning For Success: IMP/IMS Development Course/If You Fail to Plan, You Plan To Fail |
| Thanh Do |
Max Shen |
Activity Based Costing For Dental Office Management |
| Steve Duschl |
Joseph Geunes |
Analysis of the Decision to Produce the Airbus A380; Ramifications for the Civil Passenger Aircraft Industry |
| Duane Ellifritt |
Diane Schaub |
Quality Improvement at BRPH Companies |
| Berry Foster |
Edwin Romeijn |
Evaluation of Financial Risks and Benefits of Major Capital Projects at Progress Energy's Nuclear Generation Group |
| Wayne Fountain |
Suleyman Tufekci |
A Methodology for Process and Product Improvement in Innovative Organizations |
| Dave Frank |
Elif Akcali |
Planning For Success: IMP/IMS Development Course/If You Fail to Plan, You Plan to Fail |
| Matt Gorman |
Suleyman Tufekci |
Lean Initiative of the Harris Environmental Lab |
| Bob Gray |
Diane Schaub |
Assessment of Management Actions to Address Cyclic Combustion Turbine Business 1998 - 2003/Siemens Westinghouse Power Corp - G12 |
| Dick Guthrie |
Max Shen |
A Predictive ABC Model for ROI Projections |
| Bob Healy |
Edwin Romeijn |
A Method to Estimate Measurement Error In A Non-Linear System |
| Trish Langwost |
Diane Schaub |
One NASA Initiative: A New Vision and Cultural Change |
| Andy Mayer |
Suleyman Tufekci |
GFE UUT Tracking & Repair: Process Improvement Event |
| Craig McAlister |
Edwin Romeijn |
Probabilistic Metrics And Capability Maturity Modeling Integration (CMMI) |
| Chris McCurry |
Max Shen |
Raytheon Network Centric Systems/Design for 6 Sigma: The JTT Single Board Computer |
| Mike McWaters |
Suleyman Tufekci |
Lean Initiative of the Harris Environmental Lab |
| Chris Metel |
Elif Akcali |
Planning For Success: IMP/IMS Development Course/If You Fail to Plan, You Plan to Fail |
| Shawn Miller |
Max Shen |
Establishing A Successful Supplier Evaluation Process |
| Joe Morici |
Diane Schaub |
Introducing A Small Business to Quality Management |
| Randy Mosher |
Joseph Geunes |
Developing A Preventative Maintenance Program For The CCAFS 1A Command Systems |
| Dave Ott |
Max Shen |
The Efficient Utilization Of Facility Transporters With The Use Of Simulation |
| Ron Parkins |
Joseph Geunes |
Developing A Preventative Maintenance Program For The CCAFS 1A Command Systems |
| Joseph Phillips |
Diane Schaub |
Build to Order Inventory System: A New Look At Production |
| Nate Smith |
Suleyman Tufekci |
Re-Engineering The Release Process at Lockheed Martin Missiles And Fire Control - Orlando |
| Tom Terwilliger |
Joseph Geunes |
Siemen's Global Procurement Process To Improve Life Here, Extend Life There, Forward Life Beyond |