"A Manufacturing Scheduler's Perspective on
Semiconductor Fabrication," by S. X. Bai, and S. B.
Gershwin, MIT VLSI Technical Report, VLSI#: 89-518,
March, 1989.
"Scheduling Manufacturing Systems with
Work-in-Process Inventory Control: Single-Part-Type
Systems," by S. X. Bai and S. B. Gershwin, Technical
Report, OR-218-90, Operation Research Center, MIT, 1990.
"Scheduling Manufacturing Systems with
Work-in-Process Inventory Control: Multiple-Part-Type
Systems," by S. X. Bai and S. B. Gershwin, Technical
Report, OR-230-90, Operation Research Center, MIT, 1990.
"Scheduling Manufacturing Systems with
Work-in-Process Inventory Control: Reentrant
Systems," by S. X. Bai and S. B. Gershwin, Technical
Report, OR-240-91, Operation Research Center, MIT, 1991.
"Linear Formulation of Control Parameter Estimation
for Real-Time Production Scheduling," by S. X. Bai,
Master's thesis, MIT, 1991.
"A Note on The Crossmatched Blood Inventory Model by
Jagannathan and Sen," by S. X. Bai, Technical Report
92-18, Department of Industrial and Systems Engineering,
University of Florida, 1992. TYPE: RR.
"Real-Time Production Scheduling for a Wafer
Fabrication Facility," by S. X. Bai and S. B.
Gershwin, Technical Report 92-19, Department of
Industrial and Systems Engineering, University of
Florida, 1992. TYPE: RR.
"Production Scheduling in a Price Competition,"
by S. X. Bai, Y.-K. Tsai, and K. Deng, ISE 94-3, 1993.
"Real-Time Scheduling of a Manufacturing System with
Non-Resumable Setup Changes," by S. X. Bai and M.
ElHafsi, ISE 93-8, 1994.
"A Performance Evaluation of Production Control
policies Using Simulation," by V. K. Nambiar and S.
X. Bai, ISE 94-8, 1994.
"Optimal Control of a Production System with
Periodic Maintenance Part I: Solution of the One-Cycle
Problem," by Franz-Josef Kramer and S. X. Bai, ISE
94-10, 1994.
"Optimal Control of a Production System with
Periodic Maintenance Part II: Solution of the N-Cycle
Problem, by Franz-Josef Kramer and S. X. Bai, ISE 94-11,
1994.
"A production Flow Control Problem with Periodic
Maintenance," by Franz-Josef Kramer and S. X. Bai,
ISE 94-12, 1994.
"Production Flow Control for a Manufacturing System
with Flexible Routings," by F.-J. Kramer and S. X.
Bai, ISE 94-14, 1994.
"Optimal Production and Setup Control of a Dynamic
Two-Product Manufacturing System: Analytical
Solution," by M. ElHafsi and S. X. Bai, ISE 94-16,
1994.
"The Common Cycle Economic Lot Scheduling Problem
with Backorders: Benefits of Controllable Production
Rates," by M. ElHafsi and S. X. Bai, ISE 94-18,
1995.
"Optimal Production and Setup Control of a Dynamic
Two-Product Manufacturing System, with Setup Costs and
Setup Times," by M. ElHafsi and S. X. Bai, ISE 95-1,
1995.
"Simulation Experiment Design and Analysis for
Evaluating Production Control policies," by S. X.
Bai, V. K. Nambiar, C. H. Peredo, and Y. Tseng, ISE 95-8,
1995.
"An Optimal Production Flow Control Problem with
Piecewise Constant Demand," by S. X. Bai and S.
Varanasi, ISE 95-11, 1995.
"An Optimal Production Flow Control Problem with
Impulsive Demand," by M. Wiktorsson, S. Varanasi and
S. X. Bai ISE 95-13, 1995.
"Optimal and Near Optimal Control of a Two-Part-Type
Stochastic Manufacturing System with Dynamic
Setups," by M. M. El Hafsi and S. X. Bai ISE 95-10,
1995.