"Scheduling Manufacturing Systems with
Work-in-Process Inventory Control: Multiple-Part-Type
Systems," by S. X. Bai and S. B. Gershwin,
International Journal of Production Research, Vol. 32,
No. 2, 1994.
"Scheduling Manufacturing Systems with
Work-in-Process Inventory Control: Single-Part-Type
Systems," by S. X. Bai and S. B. Gershwin, IIE
Transactions, Vol. 27, pp 599-617, 1995.
"A Production Control Problem in Competition: The
Infinite Horizon Case," by S. X. Bai and T-K Tsai,
International Journal of Operations and Quantitative
Management, Vol. 1, No. 1, pp. 49-66, 1995.
"A Production Control Problem in Competition, by S.
X. Bai and T-K Tsai, Computer & Mathematics with
Applications, Vol. 29, No. 5, pp. 60-85, 1995.
Competitive Production Scheduling: A Two-Firm,
Noncooperative Finite Dynamic Game, by S. X. Bai,
accepted for publication in the Annals of Operations
Research, 1995.
"Transient and Steady State Analysis of a
Manufacturing System with Setup Changes," by S. X.
Bai and M. ElHafsi, accepted for publication in Global
Optimization, 1995.
"Hierarchical Production Control for a Manufacturing
System with Dynamic Setup Changes," by S. X. Bai, J.
H. Burhanpurwala, Y. K. Tsai and M. ElHafsi, accepted for
publication in the OR Spektrum, 1995.
"Optimal Production Control of a Dynamic Two-Product
Manufacturing System, with Setup Costs and Setup
Times," by M. ElHafsi and S. X. Bai, accepted for
publication in the Global Optimization, 1995.
"Optimal Production and Setup Control of a Dynamic
Two-Product Manufacturing System: Analytical
Solution," by M. ElHafsi and S. X. Bai, accepted for
publication in the Computer and Mathematics with
Applications, 1995.
The Common Cycle Economic Lot Scheduling Problem with
Backorders: Benefits of Controllable Production
Rates," by M. ElHafsi and S. X. Bai, accepted for
publication in the Global Optimization, 1995.
"Optimal Control of a Production System with
Periodic Maintenance," by Franz-Josef Kr\"amer
and S. X. Bai, Accepted for publication in Optimal
Control Applications & Methods, 1995.
"Scheduling Manufacturing Systems with
Work-in-Process Inventory Control: Reentrant
Systems," by S. X. Bai and S. B. Gershwin, submitted
to the OR Spektrum, 1995.
"Production Scheduling in a Price Competition,"
by S. X. Bai, Y.-K. Tsai, M. ElHafsi and K. Deng,
submitted to Operations Research, 1995.
"Real-Time Scheduling of a Manufacturing System with
Non-Resumable Setup Changes," by S. X. Bai and M.
ElHafsi, Submitted to the Computer and Industrial
Engineering, 1995.
"A Note on Determining Pure-Strategy Equilibrium
Points of Bimatrix Games," by S. X. Bai, Submitted
to the Computer and Mathematics with Applications, 1995.
"Simulation Experiment Design and Analysis for
Evaluating Production Control policies," by S. X.
Bai, V. K. Nambiar, C. H. Peredo, and Y. Tseng, submitted
to the International Journal of Production Economics,
1995.
"An Optimal Production Flow Control Problem with
Piecewise Constant Demand," by S. X. Bai and S.
Varanasi, Submitted to the Computer and Mathematical
Modeling, 1995.
"An Optimal Production Flow Control Problem with
Impulsive Demand," by M. Wiktorsson, S. Varanasi and
S. X. Bai Submitted to the Global Optimization, 1995.
"Optimal and Near Optimal Control of a Two-Part-Type
Stochastic Manufacturing System with Dynamic
Setups," by M. M. El Hafsi and S. X. Bai Submitted
to the Production and Operastions Management, 1995.